- Home
- Defense Systems
- Compare
Fujian (CV-18) Aircraft Carrier vs USS Nimitz Aircraft Carrier
1. Physical Characteristics
|
Ship Type
|
Aircraft Carrier
Aircraft Carrier
|
|
Class
|
Fujian-class
Nimitz-class
|
|
Length
|
~316 m
333 m
|
|
Beam (Width)
|
~76 m
41 m
|
|
Flight Deck Width
|
~78–80
76 m
|
|
Draft
|
~10–11 m
11.3 m
|
|
Displacement (Full Load)
|
~80,000+ tons
100,000+ tons
|
2. Propulsion & Performance
|
Propulsion Type
|
Conventional
Nuclear
|
|
Powerplant
|
Gas turbines + auxiliary systems
2 × A4W nuclear reactors
|
|
Shafts
|
4 shafts
4 shafts
|
|
Maximum Speed
|
30+ knots
30+ knots
|
|
Range
|
8,000–12,000+ nm
Unlimited
|
|
Endurance
|
45–70 days
70–90 days at sea
|
3. Flight Operations
|
Aircraft Launch System
|
CATOBAR
CATOBAR
|
|
Catapult Type
|
EMALS
Steam
|
|
Recovery System
|
Arresting gear
Arresting gear
|
|
Total Aircraft Capacity
|
60–80+
60–75 aircraft
|
|
Hangar Capacity
|
Full-length hangar
Full-length hangar
|
|
Aircraft Types Supported
|
J-35, J-15, KJ-600 AEW, helos
Fighters, AEW, EW, ASW helos
|
4. Sensors & Electronics
|
Primary Radar
|
AESA multifunction
3D air-surveillance radar
|
|
Navigation Radar
|
Standard naval navigation radar
Standard naval navigation radar
|
|
Fire Control Radar
|
CIWS & SAM support
Supports Sea Sparrow & CIWS
|
|
Electronic Warfare Suite
|
ECM, ESM, jammers
ESM/ECM jammers and countermeasures
|
|
Communication Systems
|
SATCOM, secure data links
SATCOM, Link-16
|
5. Weapons & Defense Systems
|
CIWS
|
Type 1130
Phalanx CIWS
|
|
Short-Range SAMs
|
HQ-10
RAM, NATO Sea Sparrow
|
|
Missile Launchers
|
Limited surface-defense
Limited surface-defense
|
|
Decoy Systems
|
Chaff & EW decoys
Chaff, flares, EW decoys
|
6. Command & Control
|
Combat Management System
|
Integrated CMS
Integrated U.S. Navy CMS
|
|
Combat Information Center (CIC)
|
Central command hub
Central shipboard operations hub
|
|
Air Operations Center
|
Flight operations management
Oversees flight operations
|
|
Data Links
|
SATCOM + secure tactical links
Tactical & satellite systems
|
7. Crew & Capacity
|
Ship Crew
|
~2,500 personnel
~3,000
|
|
Air Wing Personnel
|
~1,000+
~1,500
|
|
Total Complement
|
3,000–4,000+
~5,000+
|
8. Construction & Cost
|
Shipbuilder/Manufacturer
|
CSSC (China)
Newport News Shipbuilding (USA)
|
|
Construction Started
|
2015–2016 (est.)
1968
|
|
Commissioned
|
2024–2025 (expected)
1975
|
|
Estimated Cost
|
~$5–9B (conventional)
~$5B (original era cost)
|
Disclaimer Note
The information provided on TheDefenseWatch.com is for general informational purposes only. While we strive to ensure the accuracy, completeness, and timeliness of our content regarding defense and aerospace products, technologies, and specifications, we cannot guarantee that all information is 100% accurate or up-to-date due to the evolving nature of military technology and classified data.TheDefenseWatch.com does not warrant the reliability, suitability, or availability of the information for any specific purpose. Users are advised to consult official sources, such as manufacturers, government publications, or defense agencies, for precise and verified data before making decisions based on our content.We are not affiliated with any defense manufacturers, governments, or military organizations mentioned. Opinions, reviews, and ratings reflect expert analysis but are subjective and should not be considered endorsements. TheDefenseWatch.com is not responsible for any errors, omissions, or consequences arising from the use of this website’s content.External links are provided for convenience and do not imply endorsement. TheDefenseWatch.com reserves the right to update or modify content without prior notice. By using this website, you agree to our Privacy & Cookies Policy.