• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Lockheed Martin Wins $13.3 Million F-35 Engine Upgrade Contract Modification
Aerospace & AviationDefense Contracts

Lockheed Martin Wins $13.3 Million F-35 Engine Upgrade Contract Modification

Daniel Mercer / Defense & Aerospace Analyst
Last updated: October 28, 2026 1:51 am
Daniel Mercer / Defense & Aerospace Analyst
Share
3 Min Read
Pratt & Whitney Poland expansion
SHARE

Lockheed Martin has received a $13.259 million U.S. Navy contract modification to continue integrating the F135 engine core upgrade into the F-35 Lightning II program and advance work on an upgraded power and thermal management system.

Contents
  • Two F-35 Modernization Efforts Continue
    • F135 engine core upgrade integration
    • Power and thermal management moves toward preliminary design
  • Contract Details and Work Locations
  • How the Award Fits Into the Wider F135 Upgrade Program
  • Why the Work Matters for the F-35 Fleet

The modification adds 50,000 labor hours to an existing delivery order and establishes a revised contractual arrangement for work that previously proceeded under an undefinitized contract action. The effort covers the U.S. Air Force, Marine Corps, Navy and F-35 Cooperative Program Partners.

According to the contract announcement, work is scheduled to continue through April 2027. No funds will be obligated when the modification is awarded.

The award provides additional engineering and integration capacity for two related modernization efforts affecting the F-35’s propulsion and onboard power management architecture.

- Advertisement -

Two F-35 Modernization Efforts Continue

The contract modification covers two distinct but related activities: integration of the F135 engine core upgrade and the transition of the power thermal management upgrade into preliminary design.

F135 engine core upgrade integration

The F135, manufactured by Pratt & Whitney, powers all three variants of the F-35: the conventional takeoff and landing F-35A, the short takeoff and vertical landing F-35B, and the carrier-capable F-35C.

The engine core upgrade is intended to address the propulsion system’s evolving performance and operational requirements as the aircraft receives additional capabilities.

The F-35’s planned modernization requires coordination between the aircraft’s propulsion system and its expanding onboard systems. Engine integration work therefore involves more than developing an improved engine core. The upgraded propulsion configuration must also be assessed within the wider aircraft architecture.

The latest modification continues Lockheed Martin’s integration work. It does not, by itself, confirm that the upgraded engine has completed testing, received approval for operational use or entered production.

Power and thermal management moves toward preliminary design

The second element concerns the transition of the power thermal management upgrade into the preliminary design phase.

Modern combat aircraft must supply electrical power to onboard equipment while managing the heat generated by propulsion, avionics and mission systems. As aircraft capabilities expand, these demands can create additional engineering challenges.

For the F-35, power and thermal management are relevant to accommodating modernization requirements without compromising the integration of existing aircraft systems.

- Advertisement -

Moving an upgrade into preliminary design is an engineering milestone, not a declaration that the system is ready for installation across the fleet. It establishes a more structured stage for developing and assessing the proposed design before subsequent development and qualification activities.

The Navy’s announcement does not disclose the upgrade’s detailed technical specifications, expected performance improvements or a date for fleet-wide implementation.

Contract Details and Work Locations

The modification is valued at $13,259,000 and was awarded to Lockheed Martin Corp. in Fort Worth, Texas.

It modifies delivery order N0001925F0120 under basic ordering agreement N0001924G0010. The action definitizes the previously established undefinitized contract action and adds 50,000 labor hours to the ongoing effort.

The work is distributed across U.S. and British locations, reflecting the multinational industrial network supporting the F-35 program.

Work locationShare of work
Fort Worth, Texas47%
Torrance, California13%
El Segundo, California6%
Blackburn, Great Britain6%
Cheltenham, Great Britain6%
Haltom City, Texas4%
South Bend, Indiana4%
Windsor Locks, Connecticut4%
West Hartford, Connecticut4%
Rockford, Illinois4%
Orlando, Florida2%

The work is expected to be completed in April 2027. Naval Air Systems Command, based in Patuxent River, Maryland, is responsible for the contract.

The modification was not competitively procured. The announcement does not provide a separate explanation of the procurement decision.

Importantly, the $13.259 million figure represents the value of this modification, not the total cost of the F135 engine core upgrade or the broader F-35 modernization program.

How the Award Fits Into the Wider F135 Upgrade Program

The modification is part of a larger effort to modernize the F-35’s propulsion system while supporting the aircraft’s growing demands for electrical power and thermal management.

In December 2024, the Department of Defense announced an initial Lockheed Martin delivery order with a potential value of up to $107.04 million for F135-related research and development. That earlier order covered trade studies, assessments of potential power and thermal management solutions, and Block 4 engine integration work. It was scheduled for completion in December 2026.

The wider engine upgrade effort also involves Pratt & Whitney, the F135 manufacturer. In August 2026, the Department of Defense announced a separate $240.75 million modification for Pratt & Whitney to continue engineering work on the F135 engine core upgrade, address operational issues and support the transition toward engineering and manufacturing development.

These awards cover different responsibilities. Pratt & Whitney’s work focuses on the propulsion system, while Lockheed Martin’s role includes integrating engine and power management changes into the aircraft.

That distinction matters because an engine improvement must work within the F-35’s overall design. Progress in engine development does not automatically establish that the aircraft integration effort has reached the same stage.

The available contract information also does not establish that the latest Lockheed Martin modification changes the overall F135 upgrade schedule.

Why the Work Matters for the F-35 Fleet

The F-35 program combines three aircraft variants, several U.S. military services and international partners. Modernization therefore requires coordination across different operating environments and aircraft configurations.

The F135 engine core upgrade and power thermal management work address related engineering demands, but the contract does not specify which performance improvements will result from this particular modification.

The immediate outcome is contractual and technical: Lockheed Martin receives additional labor hours to continue integration work, while the power thermal management effort advances into preliminary design.

The absence of funds obligated at the time of award also requires careful interpretation. It does not mean the work is free or that the modification has no contractual value. It means funding is not being obligated at the time of this particular award action.

For now, the April 2027 completion date provides the clearest published milestone for the work covered by the modification. Further details about testing, qualification, installation schedules and operational benefits have not been established by the announcement.

TAGGED:F-35 Lightning IIF135 engineLockheed MartinU.S. Navy
Share This Article
Facebook Copy Link Print
ByDaniel Mercer / Defense & Aerospace Analyst
Follow:
Daniel Mercer is a defense and aerospace analyst at TheDefenseWatch.com covering military aviation, aerospace technology, unmanned systems, air warfare, and defense procurement. His reporting uses official documents, government and military statements, company announcements, and other public sources.

Latest Defense Systems

  • XQ-67A Drone XQ-67A Drone
  • B-25 Mitchell Bomber B-25 Mitchell Bomber
  • F-100 Super Sabre F-100 Super Sabre
  • North American F-86 Sabre North American F-86 Sabre
  • North American XB-70 Valkyrie North American XB-70 Valkyrie
  • Northrop YF-23 Fighter Northrop YF-23 Fighter
  • P-51 Mustang Fighter Aircraft P-51 Mustang Fighter Aircraft
  • Rafale F5 Fighter Rafale F5 Fighter
  • Tomahawk Block V Missile Tomahawk Block V Missile

Recent Compares

  • J-10C vs JF-17 Thunder: Which Fighter Is More Capable? J-10C vs JF-17 Thunder: Which Fighter Is More Capable? View Comparison →
  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →

Recent Posts

  • U.S. Air Force Tests XQ-67A Drone Systems for Dispersed Combat Operations
  • Lockheed Martin Wins $9.76 Million Contract for Canadian CH-148 Cyclone Electronic Warfare Software
  • Lockheed Martin Wins $13.3 Million F-35 Engine Upgrade Contract Modification
  • Army Trains Patriot Crews for Nighttime Missile Reloads
  • Hegseth Reinstates Air Force Brigadier General Forced to Retire Over COVID-19 Vaccine Mandate

You Might Also Like

ECRS Mk2 radar contract
Defense Contracts

UK Ministry of Defence Awards £453.5M ECRS Mk2 Radar Production Contract for RAF Typhoons

January 25, 2026
US FLRAA engine testing
Aerospace & AviationFighter Jets & Military Aircraft

Rolls Royce Begins Engine Testing for US FLRAA Aircraft Program

January 1, 2026
NATO F-35 integration
Aerospace & AviationFighter Jets & Military Aircraft

NATO Expands F-35 Integration Through Multinational Weapons Training In The Netherlands

September 7, 2026
Alcoa’s Wagerup alumina refinery in Western Australia, where a new gallium production facility backed by the United States, Australia and Japan is being constructed.
Defense Contracts

Department Of War Moves To Secure Gallium Supply With $174 Million Australia Project

September 7, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?