• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Boeing Wins $156.2 Million Navy Contract for P-8A and C-40A Engine Support
Defense ContractsNaval & Maritime

Boeing Wins $156.2 Million Navy Contract for P-8A and C-40A Engine Support

Samuel Drake | Defense Analyst
Last updated: August 21, 2026 12:51 am
Samuel Drake | Defense Analyst
Share
3 Min Read
Boeing P-8A engine contract
Image : U. S. Navy
SHARE
Follow The Defense Watch on Google:

Boeing Wins $156.2M Navy Contract for P-8A and C-40A Engines Support

The Boeing Co. has received a $156.2 million U.S. Navy contract covering engine support equipment for the P-8A Poseidon maritime patrol aircraft and spare engine integration for the C-40A Clipper. The award provides for up to 31 P-8A Engine Build-Up kits and up to two Quick Engine Change kits.

Contents
Boeing Wins $156.2M Navy Contract for P-8A and C-40A Engines SupportTakeaways1. $156.2 Million IDIQ Award2. Up to 31 P-8A Engine Kits3. C-40A Spare Engine Support4. Orders Will Fund the WorkWhat The Contract CoversTechnical And Operational ContextWhy The Award MattersContract BreakdownContract ValueContractorContract TypeWork LocationsPerformance PeriodFundingOptions Or Follow-On WorkIndustry And Acquisition ImplicationsWhat Happens Next

Takeaways

Key facts from the Boeing engine support contract for Navy and foreign military customers

1. $156.2 Million IDIQ Award

The Navy awarded Boeing a firm-fixed-price economic-price-adjustment IDIQ contract with a potential value of $156.2 million.

2. Up to 31 P-8A Engine Kits

The contract provides for up to 31 Engine Build-Up kits, including 18 for the Navy and 13 for Foreign Military Sales customers.

3. C-40A Spare Engine Support

Boeing can also provide up to two Quick Engine Change kits for integration with CFM56-7B24E core engines to create complete C-40A Clipper spare engines.

4. Orders Will Fund the Work

No funds were obligated at award. Funding will be provided through individual orders issued under the IDIQ contract.

The contract was awarded by Naval Air Systems Command, or NAVAIR, in Patuxent River, Maryland, according to the U.S. Department of Defense contract announcement. Boeing’s work will be performed in Tukwila, Washington, with the contract scheduled to run through August 2031.

The award is structured as a firm-fixed-price economic-price-adjustment indefinite-delivery/indefinite-quantity contract. No funds were obligated when the contract was awarded. Instead, funding will be provided through individual orders issued under the contract.

What The Contract Covers

The primary portion of the award covers up to 31 P-8A Engine Build-Up kits. Of that potential quantity, 18 kits are designated for the U.S. Navy and 13 are intended for Foreign Military Sales customers.

- Advertisement -

The kits include associated components and hardware needed to mate and integrate with CFM56-7B27AE core engines.

The contract also provides for up to two Quick Engine Change kits. These kits include associated components, mating hardware, and attaching hardware for integration with CFM56-7B24E core engines.

The stated purpose of this portion of the contract is to create complete spare engines for the C-40A Clipper.

The announcement does not identify the specific Foreign Military Sales customers receiving the 13 P-8A Engine Build-Up kits.

  • P-8A Poseidon Aircraft

    P-8A Poseidon Aircraft

    • Maximum Speed: Mach 0.78
    • Range: 7,500 nautical miles (ferry)
    • Payload Capacity: ~20,000 lb
    • Crew: 9
    • View Details →
    6.2

    Technical And Operational Context

    The P-8A Poseidon is the U.S. Navy’s principal long-range maritime patrol and reconnaissance aircraft. Its mission set includes maritime surveillance, anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance, and other naval aviation tasks.

    Engine support is therefore an important part of maintaining aircraft availability. The Boeing contract is focused on equipment and hardware required to assemble and integrate engine components rather than the purchase of complete new aircraft.

    An Engine Build-Up kit can be understood in this context as a package of components and associated hardware used to prepare an engine core for integration into an aircraft engine configuration.

    The contract separately addresses the C-40A Clipper, a Boeing 737-based military transport aircraft used by the Navy for personnel and logistics transportation. The award calls for Quick Engine Change kits associated with CFM56-7B24E core engines to create complete spare engines for the C-40A fleet.

    The contract announcement does not provide additional technical specifications for the engines, such as performance characteristics, service life, or expected installation schedules.

    C-40A
    Image : U. S. Navy

    Why The Award Matters

    The contract is significant primarily because it establishes a long-term procurement framework for engine-related equipment supporting both U.S. Navy aircraft and Foreign Military Sales customers.

    For the P-8A fleet, the potential purchase of 31 Engine Build-Up kits provides a mechanism for obtaining the components and hardware needed to support engine integration requirements over the contract period.

    The inclusion of 13 kits for Foreign Military Sales customers also reflects the international operating base of the P-8A platform. However, the announcement does not identify which countries will receive the kits, so no specific customer relationship can be established from the award alone.

    For the C-40A, the provision for two Quick Engine Change kits is tied directly to the creation of complete spare engines. That gives the Navy a separate engine-support pathway within the same contract framework.

    • Boeing C-40A Clipper Aircraft

      Boeing C-40A Clipper Aircraft

      • Maximum Speed: Mach 0.82
      • Range: About 3,142 to 3,800 nautical miles, configuration dependent
      • Payload Capacity: Up to 40,000 lb cargo, Navy configuration
      • Crew: Pilot, co-pilot, crew chief, plus mission personnel as required
      • View Details →
      3.0

      Contract Breakdown

      Contract Value

      The contract has a potential value of $156,201,219.

      Because it is an indefinite-delivery/indefinite-quantity contract, the announced value represents the contract framework rather than an immediate obligation of the full amount.

      Contractor

      Boeing Co., based in Tukwila, Washington, is the contractor.

      The contract number is N0001926D1007.

      Contract Type

      The award is a firm-fixed-price economic-price-adjustment indefinite-delivery/indefinite-quantity contract.

      The IDIQ structure allows the government to issue individual orders during the contract period for the covered requirements. The economic-price-adjustment provision provides a mechanism for adjusting applicable prices under defined contractual conditions.

      Work Locations

      Work will be performed in Tukwila, Washington.

      The announcement does not identify additional work locations.

      Performance Period

      The contract is expected to be completed in August 2031.

      Funding

      No funds were obligated at the time of award.

      The Navy will obligate funds through individual orders as they are issued under the contract.

      Options Or Follow-On Work

      The contract provides for potential quantities of up to 31 P-8A Engine Build-Up kits and up to two Quick Engine Change kits.

      The announcement does not disclose a separate option-year structure or additional follow-on contract beyond the stated IDIQ framework.

      Industry And Acquisition Implications

      From an acquisition perspective, the IDIQ structure gives the Navy flexibility to order engine-related equipment as requirements arise rather than committing the entire potential contract value at the time of award.

      The structure is also relevant to the P-8A’s international user base. Eighteen of the potential 31 P-8A kits are designated for the U.S. Navy, while 13 are allocated for Foreign Military Sales customers.

      The contract therefore combines domestic fleet support with international customer requirements within a single procurement vehicle.

      The award also illustrates the role of engine support hardware in aircraft sustainment. Maintaining an operational aircraft fleet involves more than purchasing airframes. Engine integration equipment, replacement components, and spare engines are part of the broader logistics system needed to keep aircraft available for assigned missions.

      The contract was not competed, according to the announcement. The notice does not provide the rationale for the noncompetitive award, so no further conclusion should be drawn about the procurement decision from the announcement alone.

      What Happens Next

      The next funding actions will occur through individual orders issued under the IDIQ contract.

      Those orders will determine the actual quantities purchased and the associated obligations against the contract.

      The announcement does not provide a specific schedule for individual orders, kit deliveries, engine integration, or installation on Navy aircraft.

      The contract is scheduled to remain in place through August 2031, giving the Navy a multi-year framework for procuring the covered P-8A and C-40A engine support equipment.

Enjoying our coverage?

Make The Defense Watch a preferred source on Google to see more of our geopolitical and defense insights when relevant to you.

TAGGED:BoeingP-8A PoseidonU.S. Navy
Share This Article
Facebook Copy Link Print
BySamuel Drake | Defense Analyst
Follow:
Samuel Drake is a defense analyst at TheDefenseWatch.com covering naval warfare, military ordnance, maritime technology, fleet modernization, and defense procurement. His reporting focuses on documented capabilities, procurement programs, and military technology.
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search Defense Systems

Latest Defense Systems

  • F-104 Starfighter F-104 Starfighter
  • F-15J Eagle Fighter Jet F-15J Eagle Fighter Jet
  • China’s GJ-21 Stealth Drone China’s GJ-21 Stealth Drone
  • China’s GJ-11 Stealth Drone China’s GJ-11 Stealth Drone
  • F-15EX Eagle Fighter Jet F-15EX Eagle Fighter Jet
  • TRML-4D Radar TRML-4D Radar
  • F-47A Fighter Jet F-47A Fighter Jet
  • China DF-61 Missile China DF-61 Missile
  • B61 Nuclear Bomb B61 Nuclear Bomb

Recent Compares

  • J-10C vs JF-17 Thunder: Which Fighter Is More Capable? J-10C vs JF-17 Thunder: Which Fighter Is More Capable? View Comparison →
  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →

Recent Posts

  • Saab and Poland’s Dezamet Sign MAPAM Mortar Ammunition Production Deal
  • Nordic Air Defence to Send K200 Drone Interceptor to Ukraine for Trials
  • Türkiye Inducts First Three Bayraktar Kızılelma Unmanned Fighter Aircraft
  • U.S. Army Tests SIG Sauer M7 Rifle in Indo-Pacific Jungle Training
  • India’s Rafale Fleet Listed at 32 Aircraft After 2025 Pakistan Conflict

You Might Also Like

Bell H-1 SPINE upgrade
Defense Contracts

Bell Secures $300 Million Deal For USMC H-1 Helicopter SPINE Upgrades

July 28, 2026
TKMS Middle East demand
Naval & MaritimeNaval Strategy & Maritime Security

TKMS Sees Increased Middle East Demand As Iran War Reshapes Maritime Security

August 12, 2026
Lockheed Martin Air Force contract
Cyber & Space DefenseDefense Contracts

Lockheed Martin Wins $80 Million Air Force Mission Planning Software Contract

November 4, 2026
MS-110 reconnaissance system
Defense Contracts

RTX Raytheon Secures 197 Million Dollar MS-110 Reconnaissance Contract for Poland

September 7, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?

Enjoying our coverage?

Make The Defense Watch a preferred source on Google to see more insights.