• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Bell Boeing Wins $29.7M Contract for V-22 Loads and Dynamics Data
Defense Contracts

Bell Boeing Wins $29.7M Contract for V-22 Loads and Dynamics Data

Daniel Mercer / Defense & Aerospace Analyst
Last updated: September 22, 2026 4:55 am
Daniel Mercer / Defense & Aerospace Analyst
Share
3 Min Read
Bell Boeing V-22 contract
U.S. Marine V-22 Osprey aircraft Arrive at USS Makin Island
SHARE

The U.S. Navy has awarded Bell Boeing Joint Project Office a $29.7 million order to provide loads and dynamics model data for the V-22 Osprey fleet as the aircraft program moves toward the end of production and a longer-term sustainment phase.

Contents
Takeaways1. $29.7 Million V-22 Data Order2. Data Will Support Long-Term SustainmentScope of the Bell Boeing V-22 ContractV-22 Osprey Technical and Operational ContextOperational Impact on U.S. Navy and Marine Corps V-22 FleetContract Breakdown: Bell Boeing V-22 Award DetailsContract ValueContractorContract TypeWork LocationsPerformance PeriodFundingOptions Or Follow-On WorkBell Boeing Defense Industrial Base and Acquisition ImpactProgram Milestones and Next Steps

According to the U.S. Department of War contract announcement dated September 21, 2026, the $29,674,990 cost-plus-fixed-fee order, N0001926F2168, was issued against previously established basic ordering agreement N0001922G0002. Naval Air Systems Command in Patuxent River, Maryland, is the contracting activity.

Takeaways

Key facts from the contract announcement

1. $29.7 Million V-22 Data Order

The Navy awarded Bell Boeing a $29,674,990 cost-plus-fixed-fee order for loads and dynamics model data covering all V-22 variants.

2. Data Will Support Long-Term Sustainment

The technical data will support future sustainment decisions, mishap investigations, post-production sustainment and Fleet Support Team repair and maintenance activities.

The order covers all V-22 variants and is intended to preserve engineering data needed to support the aircraft after new production ends. The announcement specifically identifies sustainment decisions, mishap investigations, transition to post-production sustainment, and Fleet Support Team repair and maintenance as uses for the data.

Scope of the Bell Boeing V-22 Contract

The central deliverable is loads and dynamics model data for the V-22 fleet. These engineering models provide information used to understand how an aircraft and its structures respond to aerodynamic, inertial, mechanical and other loads during different operating conditions.

- Advertisement -

For a complex tiltrotor such as the V-22, maintaining accurate engineering data becomes particularly important as the production system transitions toward sustainment. The models can provide an engineering reference for evaluating structural conditions, investigating aircraft incidents and supporting maintenance or repair decisions.

The Navy announcement does not disclose the specific datasets, model formats, aircraft configurations or individual engineering parameters included in the order.

The work is scheduled to occur before and concurrently with V-22 production cessation. The contract therefore links engineering data preservation with the transition from active production to post-production support.

V-22 Osprey Technical and Operational Context

The V-22 is a tiltrotor aircraft that combines vertical takeoff and landing capability with the forward-flight characteristics of a turboprop aircraft. The joint program includes variants operated by the Marine Corps, Navy and Air Force Special Operations Command.

The Marine Corps MV-22B provides assault support and transport missions, while the Navy CMV-22B performs the Carrier Onboard Delivery mission and replaced the C-2A Greyhound in that role. The Air Force Special Operations Command operates the CV-22 for long-range special operations missions.

NAVAIR identifies the V-22 as a medium-lift aircraft and lists its primary function as medium-lift assault support. The service also identifies the platform as an ACAT IC program.

The engineering information covered by the new order is therefore relevant across several aircraft configurations rather than being limited to a single V-22 variant.

Operational Impact on U.S. Navy and Marine Corps V-22 Fleet

The award comes as the V-22 program moves from aircraft production toward long-term fleet support.

- Advertisement -

The Department of Defense fiscal 2026 weapons documentation states that V-22 funding supports shutdown of the MV-22 and CMV-22 production line, including material disposition, tooling and special test equipment storage. The same documentation says modification work continues to address flight-hour costs and time-on-wing availability.

Bell and Boeing had already begun describing the transition toward sustainment. In April 2025, the companies announced the completion of the Air Force CV-22 production program and said the V-22 industrial team was moving toward fleet-wide sustainment and upgrades, while MV-22 and CMV-22 production continued.

The new Navy order expands that transition into the engineering-data domain. Maintaining authoritative technical models can help the government and industry retain the information required to support aircraft already in service after the manufacturing line closes.

This is also relevant to mishap investigations. NAVAIR has previously used engineering analysis and fleet data in response to V-22 technical issues, including investigations and flight restrictions involving the proprotor gearbox system.

Contract Breakdown: Bell Boeing V-22 Award Details

Contract Value

The order is valued at $29,674,990.

The Navy will obligate $10,310,866 in fiscal 2025 procurement funds and $19,364,124 in fiscal 2026 procurement funds at the time of award. These amounts total the stated contract value.

Contractor

The contractor is Bell Boeing Joint Project Office, based in Amarillo, Texas.

The V-22 is jointly produced by Bell and Boeing, with major program activities distributed across multiple facilities. NAVAIR identifies Bell Boeing as the V-22 contractor.

Contract Type

The Navy awarded the action as a cost-plus-fixed-fee order against basic ordering agreement N0001922G0002.

A basic ordering agreement provides a contractual framework under which individual orders can be issued. The new action is the specific funded order covered by this announcement.

Work Locations

The work will be performed at:

  • Ridley Park, Pennsylvania, 60%
  • Fort Worth, Texas, 30%
  • Amarillo, Texas, 10%

The performance locations reflect the distributed industrial structure supporting the V-22 program.

Performance Period

Work is expected to be completed in March 2030.

The duration extends beyond the anticipated end of V-22 aircraft production, reinforcing the contract’s role in the transition toward post-production engineering and sustainment.

Funding

The award uses U.S. Navy procurement funding from fiscal years 2025 and 2026.

The announcement does not identify any option value or additional funding beyond the amounts obligated at award.

Options Or Follow-On Work

The announcement does not identify options or specific follow-on contract actions.

The technical data could support future sustainment decisions, but the Navy has not publicly stated through this announcement whether additional orders will be issued for related engineering data.

Bell Boeing Defense Industrial Base and Acquisition Impact

The contract illustrates an important part of aircraft sustainment that becomes more significant as a production line approaches closure.

Ending production does not end the military requirement for an aircraft. Existing V-22s are expected to remain in service and require structural engineering, maintenance, modifications, parts support, technical assistance and investigation capabilities.

The Congressional Research Service has reported that the Department of Defense planned to close the V-22 production line in fiscal 2028, while current defense budget documents identify production-line shutdown activities.

The September 2026 award does not itself establish a new production schedule. Instead, it provides engineering data intended to support the transition described in the contract announcement.

That distinction matters for the industrial base. Once production stops, some manufacturing-specific knowledge and engineering resources can become harder to maintain. Preserving loads and dynamics models provides the government and Fleet Support Team with an established technical reference for aircraft already delivered to the services.

The Navy has also continued to fund V-22 sustainment and modernization activities. The broader program therefore represents a shift in emphasis from producing new aircraft toward maintaining and upgrading an established fleet.

Program Milestones and Next Steps

The immediate milestone is completion of the engineering-data work in March 2030.

The contract is specifically structured around the period before and concurrent with V-22 production cessation. Its stated purposes include future sustainment decisions, mishap investigations, post-production transition and Fleet Support Team maintenance and repair.

The broader V-22 program is already moving toward that post-production environment. Bell and Boeing completed the Air Force CV-22 Program of Record transition in 2025, while the Defense Department’s fiscal 2026 budget documentation provided funding for MV-22 and CMV-22 production-line shutdown activities.

The new order consequently represents an engineering-support activity tied to the long-term management of the V-22 fleet rather than a procurement of additional aircraft.

TAGGED:Bell BoeingU.S. Navy contractsV-22 Osprey
Share This Article
Facebook Copy Link Print
ByDaniel Mercer / Defense & Aerospace Analyst
Follow:
Daniel Mercer is a defense and aerospace analyst at TheDefenseWatch.com covering military aviation, aerospace technology, unmanned systems, air warfare, and defense procurement. His reporting uses official documents, government and military statements, company announcements, and other public sources.
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search Defense Systems

Latest Defense Systems

  • F-47A Fighter Jet F-47A Fighter Jet
  • China DF-61 Missile China DF-61 Missile
  • B61 Nuclear Bomb B61 Nuclear Bomb
  • Japan E-767 Airborne Japan E-767 Airborne
  • Remington 870 Shotgun Remington 870 Shotgun
  • RUTA B1 Cruise Missile RUTA B1 Cruise Missile
  • XQ-67A Drone XQ-67A Drone
  • B-25 Mitchell Bomber B-25 Mitchell Bomber
  • F-100 Super Sabre F-100 Super Sabre

Recent Compares

  • J-10C vs JF-17 Thunder: Which Fighter Is More Capable? J-10C vs JF-17 Thunder: Which Fighter Is More Capable? View Comparison →
  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →

Recent Posts

  • Marine One Explained: The Presidential Helicopter, Its Fleet and the VH-92A Transition
  • Sikorsky Wins South Korea Contract for Four S-92A+ Presidential Helicopters
  • Saudi Arabia Intercepts Missiles Targeting Riyadh as Aramco Building Is Damaged
  • US Approves Potential $1.08 Billion Black Hawk Helicopter Sale to Mexico
  • NASA Completes Final ISS Solar Array Installation, Raising Station Power Capacity by 30%

You Might Also Like

EA-18G Growler upgrade
Aerospace & AviationDefense ContractsFighter Jets & Military Aircraft

Boeing Upgrades EA-18G Growler As U.S. Navy Expands Electronic Warfare Capability

August 19, 2026
Honeywell AGT1500 turbine engine undergoing maintenance for Poland’s M1 Abrams main battle tank fleet at a new support facility.
Defense ContractsTanks & Armored Vehicles

Honeywell Expands Abrams Tank Support In Europe With New AGT1500 Engine Center In Poland

September 12, 2026
F135 engine sustainment contract
Defense Contracts

RTX Secures $42.1 Million Deal For F135 Engine Sustainment Supporting Global F-35 Fleet

September 7, 2026
HIMARS production contract expansion
Defense Contracts

Lockheed Martin Secures $1.13 Billion Deal For HIMARS Launchers To Boost U.S. And Allied Firepower

April 29, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?