• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Raytheon Wins $34.4M V-22 Tactical Software Sustainment Contract
Defense Contracts

Raytheon Wins $34.4M V-22 Tactical Software Sustainment Contract

Daniel Mercer / Defense & Aerospace Analyst
Last updated: September 22, 2026 4:36 am
Daniel Mercer / Defense & Aerospace Analyst
Share
9 Min Read
V-22 Tactical Software Suite
A V-22 Osprey, with VMM-365, flies over New York City while transporting Marines to conduct a simulated raid at Eisenhower park
SHARE

Raytheon has received a $34.36 million U.S. government order to provide engineering, management, technical and acquisition support for the V-22 Tactical Software Suite, extending software sustainment work for the V-22 fleet through August 2028.

Contents
  • Takeaways
    • 1. $34.4 Million V-22 Software Order
    • 2. Support Extends Through August 2028
  • Scope of the V-22 Tactical Software Suite Contract
  • V-22 Osprey Technical and Operational Context
  • Operational Impact on U.S. Air Force, Marine Corps and Navy V-22 Fleet
  • Contract Breakdown: Raytheon V-22 Award Details
    • Contract Value
    • Contractor
    • Contract Type
    • Work Locations
    • Performance Period
    • Funding
    • Options Or Follow-On Work
  • Raytheon Defense Industrial Base and Acquisition Impact
  • Program Milestones and Next Steps

According to the Department of War contract announcement, the $34,364,909 cost-plus-fixed-fee order was issued by Naval Air Systems Command, or NAVAIR, under previously established basic ordering agreement N0001925G0009. The order supports the operational readiness of V-22 aircraft operated by the U.S. Air Force, Marine Corps and Navy.

Takeaways

Key facts from the contract announcement

1. $34.4 Million V-22 Software Order

Raytheon received a $34,364,909 cost-plus-fixed-fee order from Naval Air Systems Command for engineering, technical, management and acquisition support for the V-22 Tactical Software Suite.

2. Support Extends Through August 2028

The work will be performed in Indianapolis, Indiana, with completion expected in August 2028. The effort supports V-22 operational readiness across the Air Force, Marine Corps and Navy.

Raytheon will perform the work in Indianapolis, Indiana. The order was not competitively procured, according to the announcement.

Scope of the V-22 Tactical Software Suite Contract

The order covers engineering, management, technical and acquisition support for sustaining the V-22 Tactical Software Suite. The announcement does not disclose individual software modifications, specific software releases, aircraft quantities, or particular capability upgrades funded by the order.

- Advertisement -

The focus on software sustainment is significant because software is an integral part of modern aircraft operation. NAVAIR has previously described V-22 software activities involving flight control, mission systems, testing, integration and fleet updates. Historical NAVAIR material shows that software changes have been used to modify V-22 aircraft behavior and improve operational capabilities.

A separate NAVAIR procurement notice for V-22 software sustainment described work involving software product updates, resolution of V-22 problem reports, qualification testing, integration into the aircraft, airworthiness substantiation and flight testing for MV-22, CMV-22 and CV-22 aircraft. That earlier requirement provides useful context for the type of engineering and fleet integration activities associated with V-22 software sustainment, although the current contract announcement does not specify which of those activities are included in this particular order.

V-22 Osprey Technical and Operational Context

The V-22 is a tiltrotor aircraft family that combines vertical takeoff and landing characteristics with airplane-mode flight. Its U.S. military variants include the Marine Corps MV-22B, Navy CMV-22B and Air Force CV-22B.

The aircraft’s software architecture is closely connected to its avionics and flight systems. NAVAIR has previously documented V-22 testing involving flight control software and mission computer software. The program has also used software changes to alter aircraft operating characteristics without requiring a major physical redesign.

The current award should therefore be viewed primarily as sustainment and engineering support rather than as a disclosed new aircraft development program. The announcement provides no evidence that the $34.36 million order represents a new V-22 variant or a major hardware modernization effort.

NAVAIR has also described the V-22 program as a joint enterprise involving all three U.S. military services that operate the aircraft. In 2022, the program office said its industry partners included Raytheon and other major V-22 suppliers and that the program was focused on sustaining the aircraft for decades of service.

Operational Impact on U.S. Air Force, Marine Corps and Navy V-22 Fleet

The immediate operational objective identified by the contract announcement is maintaining V-22 fleet readiness.

For the Marine Corps, the MV-22 is a core aviation platform for assault support missions. The Navy’s CMV-22B supports carrier logistics requirements, while the Air Force operates the CV-22 for special operations missions.

- Advertisement -

Maintaining the software baseline across these variants can require continued engineering, testing and configuration management as aircraft systems, requirements and components change. The current announcement, however, does not identify a specific readiness target, mission-capable rate or operational performance improvement.

NAVAIR’s historical V-22 work illustrates why software sustainment remains a continuing requirement. Earlier program activities included testing updated mission software, flight control software and avionics changes before fleet implementation.

Contract Breakdown: Raytheon V-22 Award Details

Contract Value

The order is valued at $34,364,909 and uses a cost-plus-fixed-fee contract structure. The stated order value should not be confused with a contract ceiling or the value of the underlying basic ordering agreement.

Contractor

Raytheon Co., Indianapolis, Indiana, is the award recipient.

Contract Type

The action is order N0001926F1166, issued against basic ordering agreement N0001925G0009. The order is cost-plus-fixed-fee and was not competitively procured.

Work Locations

All work identified in the announcement will be performed in Indianapolis, Indiana.

Performance Period

Work is expected to be completed in August 2028.

Funding

The announcement identifies funding from several fiscal years and appropriation accounts.

Fiscal 2025 funding includes:

  • $309,895 in Air Force aircraft procurement funds
  • $294,947 in Defense-Wide procurement funds

Fiscal 2026 funding includes:

  • $8,230,418 in Air Force aircraft procurement
  • $2,090,824 in Defense-Wide procurement
  • $6,109,935 in Navy aircraft procurement
  • $4,818,482 in Air Force operations and maintenance
  • $6,541,169 in Navy research, development, test and evaluation
  • $5,969,238 in Navy operations and maintenance

The listed obligations total $34,364,908, which is $1 below the stated $34,364,909 order value. This one-dollar discrepancy appears in the published figures and is not explained in the announcement. The contract notice states that these funds will be obligated at the time of award.

Options Or Follow-On Work

The announcement does not identify options, additional quantities or a separately funded follow-on order.

The underlying basic ordering agreement provides a contracting framework under which individual orders can be issued. The current action is therefore an order under that existing agreement, rather than a new standalone basic ordering agreement.

Raytheon Defense Industrial Base and Acquisition Impact

The award illustrates the continuing role of software sustainment in the defense industrial base. Aircraft readiness increasingly depends not only on airframes, engines and other physical components, but also on maintaining software, integrating updates and supporting the engineering processes needed to qualify changes.

For the V-22 program, this work spans multiple military services and aircraft variants. NAVAIR has previously described the joint V-22 program office as working with government and industry organizations across the fleet, including Raytheon.

The noncompetitive nature of the current order is also relevant to the acquisition picture. The announcement does not provide the specific justification for the procurement decision, so the reason for limiting competition should not be inferred beyond the fact that the action was not competitively procured.

Program Milestones and Next Steps

Raytheon’s current performance period is expected to continue through August 2028. The announcement does not provide a detailed schedule for individual software releases, testing events, aircraft integrations or fleet deployments.

The earlier V-22 software sustainment requirement identified a process involving software updates, problem-report resolution, qualification testing, aircraft integration, airworthiness work and flight testing. Those activities provide historical context for the broader sustainment process, but the current award notice does not confirm which individual activities will be performed under order N0001926F1166.

TAGGED:NAVAIRRaytheonV-22 Osprey
Share This Article
Facebook Copy Link Print
ByDaniel Mercer / Defense & Aerospace Analyst
Follow:
Daniel Mercer is a defense and aerospace analyst at TheDefenseWatch.com covering military aviation, aerospace technology, unmanned systems, air warfare, and defense procurement. His reporting uses official documents, government and military statements, company announcements, and other public sources.
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest Defense Systems

  • GBU-43/B MOAB Bomb GBU-43/B MOAB Bomb
  • John F. Kennedy Aircraft Carrier John F. Kennedy Aircraft Carrier
  • Voyager Tanker Voyager Tanker
  • YU-20 Tanker YU-20 Tanker
  • China KJ-500 Aircraft China KJ-500 Aircraft
  • SPY-6 Radar SPY-6 Radar
  • Boeing VC-25B Presidential Aircraft Boeing VC-25B Presidential Aircraft
  • SM-3 Block IB Missile SM-3 Block IB Missile
  • USS Abraham Lincoln Aircraft Carrier USS Abraham Lincoln Aircraft Carrier

Recent Compares

  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →
  • F-22 Raptor vs. F-35 Joint Strike Fighter: Which Fifth Generation Fighter Has the Edge? F-22 Raptor vs. F-35 Joint Strike Fighter: Which Fifth Generation Fighter Has the Edge? View Comparison →

Recent Posts

  • US Military Weighs MOAB for Potential Future Strikes on Iran, CNN Reports
  • Saab Wins $120 Million Order for New Gripen Flight Control Computer
  • L3Harris Delivers First VAMPIRE Counter-Drone Systems to U.S. Army
  • Lockheed Martin Invests $300 Million in Texas Munitions Expansion, Plans 6,000 U.S. Jobs
  • Lockheed Martin Taps Avio for ER GMLRS and PrSM Rocket Motor Production

You Might Also Like

Swedish Army personnel operating a mobile radar and command vehicle for ground based air defense operations
Conventional Weapons & ModernizationDefense Contracts

Sweden Moves To Strengthen Brigade Air Defense As Saab Secures $1.2 Billion GBAD Sensor And Command System Order

September 7, 2026
Barracuda-500M cruise missile displayed during a U.S. defense industry production and testing event with Anduril branding visible.
Artillery & Missile SystemsDefense Contracts

U.S. And Anduril Move To Mass Produce Barracuda-500M Cruise Missiles Amid Indo-Pacific Pressure

September 12, 2026
YIT
Defense Contracts

YIT Secures €30 Million Contract To Build Leopard 2A8 Tank Assembly And Maintenance Plant In Lithuania

September 7, 2026
Stark Aerospace MK 41 VLS contract
Defense Contracts

Stark Aerospace Wins $114 Million MK 41 VLS Canister Contract

September 25, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?