• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Dayton T. Brown Wins $55.8M P-8A Mobile Mission Systems Contract
Defense Contracts

Dayton T. Brown Wins $55.8M P-8A Mobile Mission Systems Contract

Daniel Mercer / Defense & Aerospace Analyst
Last updated: September 22, 2026 3:19 am
Daniel Mercer / Defense & Aerospace Analyst
Share
4 Min Read
Boeing P-8A software upgrade
SHARE

Dayton T. Brown Inc. has received a $55.84 million U.S. Navy contract modification to procure five P-8 Ground Systems and 21 Fly-Away Kits in support of the P-8A Poseidon Mobile Mission Systems mission.

Contents
Takeaways1. $55.8 Million Navy Modification2. Five Ground Systems and 21 Fly-Away KitsScope of the P-8A Mobile Mission Systems ContractP-8A Poseidon Technical and Operational ContextOperational Impact on U.S. Navy Maritime Patrol MissionsContract Breakdown: Dayton T. Brown Award DetailsContract ValueContractorContract TypeWork LocationsPerformance PeriodFundingOptions or Follow-On WorkDayton T. Brown Defense Industrial Base and Acquisition ImpactProgram Milestones and Next Steps

According to the U.S. Department of War contract announcement dated September 21, 2026, the $55,838,189 modification, designated P00029, was issued against order N0042124F0184 under basic ordering agreement N0042123G0005. The action also exercises options for continued Mobile Mission Systems support.

Takeaways

Key facts from the contract announcement

1. $55.8 Million Navy Modification

Dayton T. Brown Inc. received a $55,838,189 modification to an existing order supporting the P-8A Mobile Mission Systems mission.

2. Five Ground Systems and 21 Fly-Away Kits

The modification establishes a new material contract line item for five P-8 Ground Systems and 21 Fly-Away Kits, alongside continued MMS support.

The work is scheduled to be performed in Hollywood, Maryland, with completion expected in March 2027. The modification was not competitively procured.

Scope of the P-8A Mobile Mission Systems Contract

The modification establishes a new material contract line item within the existing order for five P-8 Ground Systems and 21 Fly-Away Kits.

- Advertisement -

The Navy said the materials will support system and subsystem modifications, upgrades, integration, and capability and capacity growth associated with the P-8A Mobile Mission Systems mission.

The action also includes options for continued MMS support, extending the contractor’s role beyond the procurement of the new equipment.

The announcement does not provide a detailed breakdown of the five ground systems or 21 Fly-Away Kits, including their individual configurations, hardware components, deployment arrangements, or unit prices.

That distinction is important because the $55.84 million figure covers the modification as a whole. The announcement does not establish an individual price for each ground system or kit.

P-8A Poseidon Technical and Operational Context

The P-8A Poseidon is the U.S. Navy’s multimission maritime patrol aircraft, based on the Boeing 737-800 platform. Its missions include anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance, maritime domain awareness, and search and rescue. Boeing identifies the aircraft’s mission system as an integrated architecture supporting radar, electronic support measures, communications, data links, acoustic sensors, and other mission equipment.

The aircraft is designed to operate as part of a wider maritime surveillance network rather than as an isolated platform. Its mission systems allow crews to collect, process, and share information during maritime patrol and reconnaissance missions.

Ground-based mission systems therefore form an important part of the wider P-8 operational architecture. The specific equipment included in the Dayton T. Brown modification is not fully described in the contract announcement, but the stated work scope shows that the procurement is intended to support modifications, upgrades, integration, and additional capability and capacity.

Boeing also describes the P-8 as using an open mission systems architecture intended to support technology insertion and future upgrades. In August 2026, Boeing and Northrop Grumman announced a demonstration involving P-8A and MQ-4C Triton teaming using Open Mission Systems and the Universal Command and Control Interface.

- Advertisement -

That broader modernization approach provides context for why deployable ground equipment and mission-support systems can remain relevant as the aircraft’s software, sensors, communications, and networking capabilities evolve.

Operational Impact on U.S. Navy Maritime Patrol Missions

The P-8A is a central component of the Navy’s maritime patrol and reconnaissance force. The aircraft is commonly used for anti-submarine warfare and intelligence, surveillance and reconnaissance missions, while also supporting anti-surface warfare and search-and-rescue operations.

The new ground systems and fly-away kits are intended to support the mission systems environment surrounding those aircraft. The contract announcement specifically identifies modifications, upgrades, integration, and capability and capacity growth as supported activities.

From an operational perspective, deployable mission-support equipment can provide flexibility for aircraft operating away from permanent infrastructure. However, the announcement does not specify where the five ground systems or 21 Fly-Away Kits will be deployed, which Navy units will receive them, or how the equipment will be distributed.

The contract therefore should not be interpreted as establishing a specific new deployment location or operational concept.

Contract Breakdown: Dayton T. Brown Award Details

Contract Value

The modification is valued at $55,838,189.

The full amount is represented by three fiscal-year funding sources:

  • $55,684,474 in fiscal 2024 Aircraft Procurement, Navy funds
  • $152,215 in fiscal 2025 Research, Development, Test and Evaluation, Navy funds
  • $1,500 in fiscal 2026 Operations and Maintenance, Navy funds

Together, those obligations total $55,838,189.

The announcement identifies these amounts as funds obligated at the time of award. They should not be confused with the ceiling value of the underlying basic ordering agreement.

Contractor

The contractor is Dayton T. Brown Inc., based in Bohemia, New York.

NAVAIR identifies Dayton T. Brown as a small business supporting naval aviation through engineering, testing, technical publications, mobile secure facilities, logistics, prototyping, manufacturing, and system support. Its Pax River area facilities include operations in Hollywood, Maryland.

Contract Type

The action is a modification to an existing order, rather than a standalone new contract.

It is identified as modification P00029 to order N0042124F0184, issued against basic ordering agreement N0042123G0005.

The announcement does not identify the underlying order as firm-fixed-price, cost-plus, or another specific pricing arrangement. Therefore, no specific contract pricing type should be inferred from the announcement.

Work Locations

The contract work will be performed in Hollywood, Maryland.

The announcement identifies March 2027 as the expected completion date.

Performance Period

Work is expected to be completed in March 2027.

The announcement does not provide individual delivery dates for the five P-8 Ground Systems or 21 Fly-Away Kits.

Funding

The modification is funded through three Navy appropriations:

Fiscal YearAppropriationAmount
FY2024Aircraft Procurement, Navy$55,684,474
FY2025Research, Development, Test and Evaluation, Navy$152,215
FY2026Operations and Maintenance, Navy$1,500
TotalCurrent modification$55,838,189

Options or Follow-On Work

The modification exercises options for continued Mobile Mission Systems support.

The announcement does not disclose the value of the exercised options separately from the total modification value, nor does it provide a detailed description of the option periods.

Dayton T. Brown Defense Industrial Base and Acquisition Impact

The award illustrates how P-8A modernization extends beyond the aircraft itself.

As the Navy upgrades mission systems, supporting infrastructure must also accommodate new hardware, software, integration requirements, and operational configurations. The contract’s reference to system and subsystem modifications, upgrades, integration, and capability and capacity growth indicates that the effort is tied to this broader support environment.

Dayton T. Brown’s role also reflects the contribution of specialized small businesses to naval aviation programs. NAVAIR lists the company as a small business and identifies capabilities spanning engineering, testing, technical publications, logistics, prototyping, manufacturing, and system support.

The procurement was not competitively procured. The announcement does not state the specific statutory or regulatory basis for that procurement decision, so no further conclusion about the acquisition rationale can be drawn from the available notice.

Program Milestones and Next Steps

The immediate milestone is procurement and delivery of the five P-8 Ground Systems and 21 Fly-Away Kits, together with continued MMS support under the modified order.

Work is expected to continue through March 2027.

The contract notice does not provide additional milestones for system integration, testing, fielding, or operational acceptance. Those activities should therefore not be assumed to have specific dates based solely on this award.

The broader P-8 program continues to evolve. Boeing states that the P-8’s open mission systems architecture is designed to support future technology insertion, while recent work with the MQ-4C Triton has demonstrated efforts to expand standards-based manned-unmanned teaming and mission interoperability.

For the Navy, the relevance of the Dayton T. Brown modification is therefore primarily in maintaining and expanding the mission-support infrastructure that allows the P-8A’s mission systems to be modified and integrated as the platform evolves.

TAGGED:Defense contractsP-8A PoseidonU.S. Navy
Share This Article
Facebook Copy Link Print
ByDaniel Mercer / Defense & Aerospace Analyst
Follow:
Daniel Mercer is a defense and aerospace analyst at TheDefenseWatch.com covering military aviation, aerospace technology, unmanned systems, air warfare, and defense procurement. His reporting uses official documents, government and military statements, company announcements, and other public sources.
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search Defense Systems

Latest Defense Systems

  • F-47A Fighter Jet F-47A Fighter Jet
  • China DF-61 Missile China DF-61 Missile
  • B61 Nuclear Bomb B61 Nuclear Bomb
  • Japan E-767 Airborne Japan E-767 Airborne
  • Remington 870 Shotgun Remington 870 Shotgun
  • RUTA B1 Cruise Missile RUTA B1 Cruise Missile
  • XQ-67A Drone XQ-67A Drone
  • B-25 Mitchell Bomber B-25 Mitchell Bomber
  • F-100 Super Sabre F-100 Super Sabre

Recent Compares

  • J-10C vs JF-17 Thunder: Which Fighter Is More Capable? J-10C vs JF-17 Thunder: Which Fighter Is More Capable? View Comparison →
  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →

Recent Posts

  • Marine One Explained: The Presidential Helicopter, Its Fleet and the VH-92A Transition
  • Sikorsky Wins South Korea Contract for Four S-92A+ Presidential Helicopters
  • Saudi Arabia Intercepts Missiles Targeting Riyadh as Aramco Building Is Damaged
  • US Approves Potential $1.08 Billion Black Hawk Helicopter Sale to Mexico
  • NASA Completes Final ISS Solar Array Installation, Raising Station Power Capacity by 30%

You Might Also Like

SLCM-N fire control system
Defense Contracts

General Dynamics Secures $194 Million Deal For SLCM-N Fire Control Engineering

September 7, 2026
Bell Boeing V-22 contract
Defense Contracts

Bell Boeing Wins $19.8M V-22 Tactical Software Support Contract

September 19, 2026
Arctic over-the-horizon radar
Defense Contracts

Australia Secures $2.5 Billion Deal For Arctic Over-the-Horizon Radar System

September 7, 2026
ELTA North America U.S. Navy contract
Global News

ELTA North America Wins $11M U.S. Navy Airborne HF/UHF Stand-Off Jammer Contract

January 6, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?