• Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools
TheDefenseWatch.com
  • Aerospace & Aviation
  • Military & Ordnance
  • Naval & Maritime
  • Cyber & Space Defense
  • Policy & Strategy
  • Global News
  • Tools Library
    • Smart Calculator
    • Drone Flight Time Calculator
    • Drone Range Calculator
    • Counter-Drone Jammer Effective Range Calculator
    • Counter-Battery Radar Detection Calculator
    • Artillery Fire Correction Calculator
    • Thermal Camera Detection Range Calculator
    • Missile Range & Time-of-Flight Calculator
    • Radar Detection Range Calculator
    • FPV Strike Drone Payload vs Range Calculator
    • Loitering Munition Endurance Calculator
    • Sniper Ballistic Drop & Windage Calculator
    • Bullet Drop Calculator
    • U.S. Army Combat Fitness Test (ACFT) Calculator
    • Military Pension Calculator
    • Military Retirement Calculator
    • Military Pension Calculator
    • Large Number Calculator
Font ResizerAa

TheDefenseWatch.com

The Defense Watch | U.S. & Global Defense News, Analysis & Military Updates

Search
  • Home
  • About
  • Defense Systems
  • Manufacturer
  • Comparisons
  • Compare 
  • Tools

Stay Updated

Get the latest update

Subscribe

Explore

  • Drone
  • Fighter Jets & Military Aircraft
  • Hypersonic Weapons
  • Aircraft Carriers
  • Strategic History & Missions
  • Tools Library
Home » Lockheed Martin Secures $29.6 Million Deal For F-35 Pilot Flight Equipment
Defense Contracts

Lockheed Martin Secures $29.6 Million Deal For F-35 Pilot Flight Equipment

Daniel Mercer / Defense & Aerospace Analyst
Last updated: September 17, 2026 1:35 am
Daniel Mercer / Defense & Aerospace Analyst
Share
5 Min Read
F-35 pilot flight equipment
Image: U.S. Air Force
SHARE
Follow The Defense Watch on Google:

Takeaways

Lockheed Martin receives a $29.6 million order for F-35 pilot flight equipment.

1. $29.6 Million F-35 Order

Lockheed Martin Aeronautics has received a $29.6 million firm-fixed-price order for F-35 pilot flight equipment under NAVAIR order N0001926F0236.

2. Supports Lot 18-19 Aircraft

The equipment will support Lot 18 and Lot 19 F-35 aircraft deliveries as well as operational aircraft already entering service.

3. Covers U.S. and International Users

The order supports the Air Force, Marine Corps, Navy, Foreign Military Sales customers and non-U.S. Department of War participants.

4. Work Runs Through July 2029

Work will be performed primarily in London, United Kingdom, with additional work in Greenville, Texas, and Grand Rapids, Michigan, and is scheduled for completion in July 2029.

5. International Funding Is Significant

The award includes $4.04 million in FMS funding and $5.29 million from non-U.S. Department of War participants, highlighting the international scale of the F-35 fleet.

Lockheed Martin Wins $29.6 Million F-35 Pilot Equipment Order

Lockheed Martin has received a $29.6 million U.S. Navy order to procure F-35 pilot flight equipment supporting Lot 18 and Lot 19 aircraft deliveries and operational aircraft across the U.S. military and international F-35 community.

Contents
Takeaways1. $29.6 Million F-35 Order2. Supports Lot 18-19 Aircraft3. Covers U.S. and International Users4. Work Runs Through July 20295. International Funding Is SignificantLockheed Martin Wins $29.6 Million F-35 Pilot Equipment OrderContract Details And FundingLondon Accounts For Most Of The WorkWhy Pilot Equipment Matters To F-35 ReadinessThe Helmet Is Part Of The Aircraft’s Sensor InterfaceLot 18 And Lot 19 Support A Continuing Production PipelineInternational Fleet Growth Increases Equipment RequirementsProduction And Support Extend Into 2029What The Award Means For F-35 ReadinessBottom Line

The firm-fixed-price order, N0001926F0236, was issued against basic ordering agreement N0001924G0010. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. The order was not competed.

The award provides another example of how F-35 procurement extends beyond the aircraft itself. Pilot equipment is a necessary part of bringing new fighters into operational service and maintaining the equipment needed by pilots already flying the aircraft.

  • F-35 Lightning II Fighter Jet

    F-35 Lightning II Fighter Jet

    • Generation: 5th
    • Maximum Speed: Mach 1.6 (1,200 mph / 1,930 km/h)
    • No. of Engines: 1
    • Radar Range: ~150+ km (AN/APG-81 AESA)
    • View Details →
    8.8

    Contract Details And Funding

    The $29.6 million award is funded through several procurement accounts, reflecting the multinational customer base supported by the F-35 program.

    Contract elementDetails
    ContractorLockheed Martin Aeronautics Co.
    Award value$29.6 million
    Contract typeFirm-fixed-price
    Order numberN0001926F0236
    Basic ordering agreementN0001924G0010
    Aircraft supportedF-35 Lot 18-19 and operational aircraft
    Contracting activityNaval Air Systems Command
    CompletionJuly 2029
    CompetitionNot competed
    F-35 Lightning II Fighter Jet

    The largest funding share comes from U.S. aircraft procurement accounts. The Air Force contribution is $11.20 million, while Navy aircraft procurement provides approximately $9.07 million.

    FMS customers are providing $4.04 million, while non-U.S. Department of War participants account for approximately $5.29 million.

    The combined international funding represents about 31.5 percent of the total order. That distribution underscores the extent to which F-35 equipment procurement is tied to a multinational fleet rather than exclusively to U.S. aircraft.

    London Accounts For Most Of The Work

    The contract has a notably international workshare profile.

    Approximately 96.15 percent of the work will be performed in London, United Kingdom. Greenville, Texas, accounts for 3.81 percent, while Grand Rapids, Michigan, represents the remaining 0.04 percent.

    The concentration of work in the United Kingdom is consistent with the broader industrial structure of the F-35 program, which relies on partner-country industrial participation alongside U.S. production and support activities.

    NAVAIR’s F-35 program overview identifies Lockheed Martin as the F-35 prime contractor and notes the participation of major international and U.S. industrial partners in manufacturing the aircraft.

    Why Pilot Equipment Matters To F-35 Readiness

    Pilot flight equipment can appear secondary compared with major aircraft components, engines, weapons or sensors. Operationally, however, it is directly connected to the ability to put trained pilots into aircraft and conduct missions safely.

    The F-35 is designed around a tightly integrated pilot-machine interface. Its helmet-mounted display system provides flight and tactical information while integrating imagery from the aircraft’s sensors.

    The F-35 program’s official technical overview states that the aircraft’s sensor suite includes the AN/APG-81 active electronically scanned array radar, Distributed Aperture System, Electro-Optical Targeting System and electronic warfare capabilities. The helmet-mounted display forms an important part of how that information reaches the pilot.

    • AN/APG-81 AESA Radar

      AN/APG-81 AESA Radar

      • Detection Range: About 150 km or more publicly cited; exact operational performance classified
      • Frequency Band: X-band
      • Antenna Type / Technology: Active Electronically Scanned Array (AESA)
      • Target Tracking Capacity: Multiple simultaneous air targets; exact official capacity classified
      • View Details →
      9.8

      The Distributed Aperture System uses infrared cameras positioned around the aircraft to generate imagery that can be displayed through the pilot’s helmet. This allows the pilot to access information that would traditionally require separate aircraft displays or visual references.

      That makes pilot equipment more than conventional protective clothing. It is part of the operational interface between the pilot and the F-35’s mission systems.

      The Helmet Is Part Of The Aircraft’s Sensor Interface

      The F-35’s Gen III Helmet Mounted Display System is particularly important to this relationship.

      Lockheed Martin’s F-35 partner information identifies Collins Aerospace as the provider of the Gen III Helmet Mounted Display System. The system is designed to provide pilots with information from the aircraft’s sensors while supporting situational awareness during flight.

      The system also removes some of the traditional separation between cockpit displays and the pilot’s direct view of the battlespace.

      That matters because the F-35 was designed around sensor fusion rather than simply giving the pilot access to individual sensors. Information from radar, electro-optical systems, infrared cameras and electronic warfare systems is processed into a common operational picture.

      As a result, maintaining the availability and compatibility of pilot equipment is part of maintaining the aircraft’s intended mission capability.

      Lot 18 And Lot 19 Support A Continuing Production Pipeline

      The new order is tied specifically to Lot 18 and Lot 19 aircraft deliveries.

      F-35 production is organized through successive procurement lots, with equipment and support contracts covering the systems needed to deliver and operate aircraft in each production group. Pilot equipment therefore has to remain synchronized with aircraft deliveries, training pipelines and operational fleet requirements.

      The contract also covers operational aircraft, meaning the requirement is not limited to newly delivered fighters.

      This distinction is important for a growing fleet. As more F-35s enter service, demand for pilot equipment expands beyond initial aircraft deliveries to include replacements, additional equipment and support for active operational units.

      Lockheed Martin’s published F-35 data has previously highlighted the scale of the training and operational enterprise surrounding the aircraft. In June 2024, the company reported more than 2,460 trained maintainers, more than 16,290 trained pilots and more than 860,000 F-35 flight hours at that point in the program.

      Those figures illustrate why equipment procurement must scale alongside aircraft production.

      International Fleet Growth Increases Equipment Requirements

      The award also demonstrates the multinational character of the F-35 fleet.

      The order supports FMS customers and non-U.S. participants in addition to U.S. Air Force, Marine Corps and Navy requirements. The F-35 program’s official data lists numerous international operators and program participants, creating a large and geographically distributed user base.

      For the United States, this has operational implications beyond aircraft sales.

      A common aircraft platform operated by multiple allied countries creates opportunities for shared training, logistics, maintenance knowledge and interoperability. Standardized pilot equipment can contribute to that common operating framework by ensuring personnel operating the same aircraft family use equipment designed around the same cockpit and mission-system architecture.

      The multinational structure also places greater importance on supply-chain coordination. Equipment must be available where aircraft and pilots are based, while replacement and support requirements must be managed across different national procurement systems.

      U.S. Air Force F-35 stealth fighter undergoing maintenance inside a military hangar during corrosion inspection work.

      Production And Support Extend Into 2029

      The contract is scheduled for completion in July 2029, giving Lockheed Martin several years to deliver the equipment associated with the order.

      The extended performance period reflects the continuing nature of the F-35 production and sustainment cycle. Aircraft delivered during the period will require trained pilots, operational equipment and support infrastructure to reach and maintain mission readiness.

      The order therefore fits into a broader series of F-35 procurement actions involving aircraft equipment, spares, modifications and sustainment.

      Recent F-35 procurement activity has included large orders for aircraft spares and other equipment under the same N0001924G0010 basic ordering agreement. For example, a July 2026 order valued at more than $1.6 billion procured initial spares for F-35 production aircraft supporting U.S., FMS and program-partner fleets.

      The pattern shows that aircraft procurement is increasingly accompanied by a large supporting ecosystem of components, equipment and sustainment resources.

      What The Award Means For F-35 Readiness

      The immediate purpose of the $29.6 million order is straightforward: provide pilot flight equipment for aircraft entering delivery pipelines and for operational F-35 fleets.

      Its broader significance lies in the relationship between aircraft availability and the personnel and equipment required to use those aircraft.

      An F-35 cannot generate operational capacity simply because an airframe has been delivered. Pilots must be trained, equipped and supported, while maintenance personnel, spare parts, software and mission systems must also be available.

      The Navy has separately emphasized the importance of F-35 component readiness as part of keeping aircraft available for training and operational missions. NAVAIR has described efforts to establish repair capabilities for an expanding range of F-35 components and to reduce dependence on outside sources for selected maintenance workloads.

      The new pilot equipment order fits within that same readiness equation.

      For the U.S. services and F-35 international community, ensuring that pilots have the required flight equipment as aircraft deliveries accelerate helps prevent a gap between receiving aircraft and having the personnel and equipment needed to operate them.

      Bottom Line

      Lockheed Martin’s $29.6 million F-35 pilot flight equipment order is a relatively small contract compared with major aircraft procurement awards, but it addresses a requirement directly connected to operational readiness.

      The order supports Lot 18 and Lot 19 aircraft as well as operational F-35 fleets, with funding from U.S. services, FMS customers and non-U.S. Department of War participants.

      With most of the work centered in London and completion scheduled for July 2029, the award also highlights the international industrial and operational structure behind the F-35 program.

      As F-35 fleets continue to expand, procurement of pilot equipment, spares and other support items will remain an essential part of converting aircraft production into usable combat capability.

Enjoying our coverage?

Make The Defense Watch a preferred source on Google to see more of our geopolitical and defense insights when relevant to you.

TAGGED:F-35 Lightning IILockheed Martin
Share This Article
Facebook Copy Link Print
ByDaniel Mercer / Defense & Aerospace Analyst
Follow:
Daniel Mercer is a defense and aerospace analyst at TheDefenseWatch.com covering military aviation, aerospace technology, unmanned systems, air warfare, and defense procurement. His reporting uses official documents, government and military statements, company announcements, and other public sources.
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search Defense Systems

Latest Defense Systems

  • FGM-148 Javelin Anti-Tank Missile FGM-148 Javelin Anti-Tank Missile
  • F-104 Starfighter F-104 Starfighter
  • F-15J Eagle Fighter Jet F-15J Eagle Fighter Jet
  • China’s GJ-21 Stealth Drone China’s GJ-21 Stealth Drone
  • China’s GJ-11 Stealth Drone China’s GJ-11 Stealth Drone
  • F-15EX Eagle Fighter Jet F-15EX Eagle Fighter Jet
  • TRML-4D Radar TRML-4D Radar
  • F-47A Fighter Jet F-47A Fighter Jet
  • China DF-61 Missile China DF-61 Missile

Recent Compares

  • J-10C vs JF-17 Thunder: Which Fighter Is More Capable? J-10C vs JF-17 Thunder: Which Fighter Is More Capable? View Comparison →
  • Tejas vs Gripen: Key Differences and Capabilities Tejas vs Gripen: Key Differences and Capabilities View Comparison →
  • Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter Tejas vs MiG-21 Bison: How India Replaced Its Iconic Supersonic Fighter View Comparison →
  • F-35 vs F-16: Stealth, Sensors and Combat Roles F-35 vs F-16: Stealth, Sensors and Combat Roles View Comparison →
  • Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared Tejas Fighter Jet vs F-16 Fighting Falcon: Capability Compared View Comparison →
  • Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? Rafale Fighter Jet vs F-16 Fighting Falcon : Which Fighter Has the Edge? View Comparison →
  • Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared Su-57 Fighter Jet vs J-20 Fighter Jet: Stealth and Air Combat Compared View Comparison →
  • Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization Mirage 2000 vs Tejas Mk1A: Legacy Combat Power vs Indigenous Modernization View Comparison →
  • Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? Rafale Fighter Jet vs F-22 Raptor: Which Air Dominance Fighter Has the Edge? View Comparison →
  • Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft Tejas Fighter Jet vs. Rafale Fighter Jet: India’s Indigenous Fighter Meets France’s Proven Multirole Combat Aircraft View Comparison →

Recent Posts

  • PLA Expands Joint Training to Improve Navy, Air Force and Rocket Force Coordination
  • How the Korean Service Corps Supports U.S.-ROK Military Readiness
  • Northrop Grumman Highlights 500,000 Hours of Autonomous ISR Flight Experience
  • 101st Airborne Tests Drones for Explosive and Smoke Delivery
  • U.S. Army Plans 20 IFPC Launchers for Guam Missile Defense by 2027

You Might Also Like

NASAMS air defense launcher and Sentinel radar system deployed during a missile defense exercise in a desert environment.
Defense Contracts

RTX Secures $1 Billion Deal For NASAMS Air Defense Systems Bound For Kuwait

September 7, 2026
Canada F-35 fighter delivery 2026
Aerospace & AviationFighter Jets & Military Aircraft

Canada Receives First Two F-35 Fighters as Review of 72 Aircraft Continues

October 26, 2026
Skjold-Class Corvettes Radar Upgrade
Defense Contracts

Kongsberg Secures NOK 410 Million Contract To Upgrade Skjold-Class Corvettes Radar And Sensors

September 7, 2026
Rolls-Royce C-130J support
Defense Contracts

Rolls-Royce Secures Propulsion Support Deal For French-German C-130J Fleet

August 10, 2026

Logo

Copyright © 2026 TheDefenseWatch.com

Helpful Links

  • Home
  • About Us
  • Privacy Policy
  • Terms of Use / Disclaimer
  • U.S. Privacy Notice – CCPA Compliance

Defense Systems

  • Defense Systems
  • Comparisons 
  • Manufacturer
  • Tactical Calculators

Popuplar

Which 5 Air Forces Possess the Costliest Fighter Jet Fleets in the World
Evolving Strategic Value: Carrier Strike Groups in the Indo-Pacific’s Future Security Architecture
Autonomous Weapon Systems Spark U.S. Ethics Debate Amid Rapid Military AI Integration

We report on developments involving military forces, governments, defense companies, research organizations, and security institutions around the world. 

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?

Enjoying our coverage?

Make The Defense Watch a preferred source on Google to see more insights.